<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Petrostar Petroleum News &#187; Press</title>
	<atom:link href="http://petrostarpetroleum.ca/blog/archives/category/press/feed" rel="self" type="application/rss+xml" />
	<link>http://petrostarpetroleum.ca/blog</link>
	<description>Just another WordPress weblog</description>
	<lastBuildDate>Mon, 10 May 2010 22:38:15 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Petrostar Continues Bakken Exploration</title>
		<link>http://petrostarpetroleum.ca/blog/archives/84</link>
		<comments>http://petrostarpetroleum.ca/blog/archives/84#comments</comments>
		<pubDate>Thu, 11 Sep 2008 15:00:45 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Bakken]]></category>
		<category><![CDATA[Info]]></category>
		<category><![CDATA[News Releases]]></category>
		<category><![CDATA[Press]]></category>

		<guid isPermaLink="false">http://www.petrostarpetroleum.ca/blog/?p=84</guid>
		<description><![CDATA[
VANCOUVER, BRITISH COLUMBIA &#8211; Petrostar Petroleum Corporation is pleased to announce that it has surveyed and is applying for its 3rd and 4th well drilling permit in the Bakken Oil Play in SE Saskatchewan.
The program will commence as soon as the drilling permit is received. Further details are expected to be announced shortly.
The Company is [...]]]></description>
			<content:encoded><![CDATA[<p><span id="more-84"></span><br />
VANCOUVER, BRITISH COLUMBIA &#8211; Petrostar Petroleum Corporation is pleased to announce that it has surveyed and is applying for its 3rd and 4th well drilling permit in the Bakken Oil Play in SE Saskatchewan.</p>
<p>The program will commence as soon as the drilling permit is received. Further details are expected to be announced shortly.</p>
<p>The Company is currently continuing to seek out and acquire lands of interest, and Petrostar, to date, has obtained the mineral rights to 22 separate leaseholds with more expected to be acquired in the near future.</p>
<p>The Company is currently testing its two initial wells under a tight hole policy as it continues to increase its presence in the SE Saskatchewan area.</p>
<p>The Company is also looking at acquisitions in the SW area of Manitoba, which is also included in the Bakken Oil Play.</p>
<p>On behalf of the Board of Directors,</p>
<p>Robert A. Sim, President and Director</p>
<p style="margin-top: 26px">
<p class="tiny">Safe Harbor Statement and Disclaimer:<br />
This Press Release includes &#8220;forward-looking statements&#8221; within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Act of 1934. A statement identified by the words &#8220;expects&#8221;, &#8220;projects&#8221;, &#8220;plans&#8221;, and certain of the other foregoing statements may be deemed forward-looking statements. Although Petrostar Petroleum Corporation believes that the expectations reflected in such forward-looking statements are reasonable, these statements involve risks and uncertainties that may cause actual future activities and results to be materially different from those suggested or described in this press release. These include risks inherent in the development and production of oil wells, including risks of fire, explosion, blowout, pipe failure, casing collapse, unusual or unexpected formation pressures, environmental hazards, and other operating and production risks inherent in oil production activities, which may temporarily or permanently reduce production or cause initial production or test results to not be indicative of future well performance or delay the timing of sales or completion of production operations; risks with respect to oil prices, a material decline in which could cause the Company to delay or suspend planned drilling operations or reduce production levels; and risks relating to the availability of capital to fund drilling operations that can be adversely affected by adverse drilling results, production declines and declines in oil prices and other risk factors.</p>
]]></content:encoded>
			<wfw:commentRss>http://petrostarpetroleum.ca/blog/archives/84/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>TLC Could Be Just The Ticket &#8211; Tool&#039;s Gentle Stimulation Increases Heavy Oil Production</title>
		<link>http://petrostarpetroleum.ca/blog/archives/41</link>
		<comments>http://petrostarpetroleum.ca/blog/archives/41#comments</comments>
		<pubDate>Tue, 08 Jan 2008 21:14:27 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Press]]></category>

		<guid isPermaLink="false">http://www.petrostarpetroleum.ca/blog/archives/41</guid>
		<description><![CDATA[Click here to download this article in PDF format

&#160;
	body { 		margin:10px 10px 0px 10px; 		padding:0px; 		font: normal 10pt Arial, Helvetica; 	}
#mainleftandcenter { 		width:67%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}
#mainright { 		width:33%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}
#mainleftsub { 		width:50%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}
#mainrightsub { 		width:50%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}
p,h1,h2,pre { 		margin: 0px 10px 10px 10px; 		}
h1 { 		font-size: 15pt; [...]]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.petrostarpetroleum.ca/pdf/TLC%20Just%20The%20Ticket%20(2007-12).pdf">Click here to download this article in PDF format</a></p>
<p><span id="more-41"></span></p>
<p style="margin-top: 12px">&nbsp;</p>
<style type="text/css">	body { 		margin:10px 10px 0px 10px; 		padding:0px; 		font: normal 10pt Arial, Helvetica; 	}</p>
<p>#mainleftandcenter { 		width:67%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}</p>
<p>#mainright { 		width:33%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}</p>
<p>#mainleftsub { 		width:50%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}</p>
<p>#mainrightsub { 		width:50%; 		float:left; 		background:#fff; 		padding-bottom:10px; 	}</p>
<p>p,h1,h2,pre { 		margin: 0px 10px 10px 10px; 		}</p>
<p>h1 { 		font-size: 15pt; 		padding-top: 10px; 	}</p>
<p>h2 { 		font: italic 11pt Arial, Helvetica; 	}</p>
<p>#banner h1 { margin:0px; padding:10px}</p>
</style>
<p><strong>NEW TECHNOLOGY MAGAZINE, DECEMBER 2007 &#8211; WELL OPTIMIZATION AND ENHANCED RECOVERY</strong></p>
<h1>TLC Could Be Just The Ticket</h1>
<h2>Tool&#8217;s Gentle Stimulation Increases Heavy Oil Production</h2>
<p id="mainleftandcenter"> <img src="http://www.petrostarpetroleum.ca/blog/wp-content/tlc-just-the-ticket_img_1.jpg" alt="NTM article images" height="248" width="480" /></p>
<p style="margin: 0px 10px; font-size: 8pt"> 			<font color="#0069ad">GENTLE STIMULATION</font>  Left: Petrostar&#8217;s Down Hole Tool being installed in a heavy oil well. Right: Connected by an encased coil cable to an energy source at surface, the DHT provides heat to generate steam and pressure downhole.</p>
<p style="margin-top: 20px">&nbsp;</p>
<p><strong>J.A. (Sandy) Sprinkle</strong> has been in and around the oil and gas business for a lot of years, in many facets, and only now, after nearly four decades, has he found people who will listen to his ideas.  		He started out as a production engineer for several oil and gas producers. Much later, he earned an education degree and taught petroleum and instrumentation at the Northern Alberta Institute of Technology and Lakeland College. He ran a chemical business, treating chemicals. He was a consultant in the petroleum and construction industries. He even tried retirement for a while. Most recently, he designed and sized production equipment.  		Now, Vancouver-based Petrostar Petroleum Corporation has offered him the opportunity to put into practice what he&#8217;s been saying all along: that the best way to stimulate heavy oil wells, and not wreck the reservoir, is to do it gently.  		&#8220;These guys gave me the chance to consult because they&#8217;re talking the same language I&#8217;ve been talking 30 years, and it&#8217;s kind of interesting&#8230; they&#8217;re doing just what I would have done a long time ago,&#8221; he says.  		With Sprinkle as its senior production engineer and senior research and development engineer, any day now Petrostar will take a second stab at testing a tool designed to reduce the viscosity of heavy oil so that the oil flows more easily through traditional and horizontal wells, and can then be pushed out using heat and gas.  		Petrostar&#8217;s patent-pending Down Hole Tool(DHT) is electrical and similar to a stove element, but is about three inches in diameter and about four feet long. It sits at the bottom of a hole, opposite perforations to the oil formation. Water trickles past it and is almost made into steam, and that&#8217;s what pushes into the formation and warms everything up, he explains.  		Current methods of using steam to help recover oil, steam-assisted gravity drainage (SAGD) and VAPEX (vapour extraction), are energy- and capital-intensive.</p>
<p>SAGD is an expensive, major undertaking that requires a tremendous amount of steam, a steam generator, steam engineers, a source of fresh water, a way to collect it and government approvals, says Sprinkle. The DHT needs none of those. Petrostar is simply heating water and keeping the downhole pressure high enough that it doesn&#8217;t collect scale buildup and burn out, he says.  		SAGD can be quite violent, says Sprinkle. On occasion the steam cavity bursts through the production zone blowing sand and oil and sometimes even shale all over the place, and operators have trouble with their pumps.  		&#8220;This is gentle. We&#8217;re looking at three, four, five times the production of a primary well, but steady. What we&#8217;re looking at is profitable. The investment is small, relatively, and the returns could be enormous,&#8221; he says.  		Most wells in the test area of west-central Saskatchewan produce a maximum of seven per cent of the oil in the ground on primary production. &#8220;We&#8217;re thinking this is going to push it to 30 to 40%, and then we&#8217;ll wait for a couple of years and start again, because the oil&#8217;s still there,&#8221; says Sprinkle, adding the formation may need a year or two to recharge before oil comes back to the wells.  		Instead of producing for the usual five to 10 years, wells might produce for 50 years using Petrostar&#8217;s DHT, contends Sprinkle. &#8220;We&#8217;re looking at a long period of time, not extreme production,&#8221; he says.  		The DHT uses mostly reservoir water so there are fewer water disposal issues.  Any additional water that&#8217;s needed will be trucked in and the company estimates between two and 20 barrels per day per well will be needed for what Sprinkle calls &#8220;a nice, closed process.&#8221;  The first-generation DHT was tested on two wells that were thought to have no reserves. The first test took place last summer on a well near Maidstone, Saskatchewan, in the McLaren formation, which contains 12-to 15-degree API oil. The well was heated for about two weeks and its production doubled to 12 bbls per day from six bbls for a few weeks after the tool was removed.  	The second well was heated for about six weeks and the nearby wells showed a response immediately. Production increased sixfold, to more than 17 bbls per day from almost three bbls per day, lasting for four to five weeks after the tool was removed.  	Two second-generation (Gen2) tools are being deployed on the company&#8217;s Maidstone well in the Waseca formation. They&#8217;re vastly different from the first, says Wade Tokarek, Petrostar&#8217;s area production superintendent.  	The first-generation tool allowed water to run through it, causing scale buildup, and was deployed via coiled tubing. Gen2&#8217;s elements don&#8217;t touch the fluid at all, so there&#8217;s no buildup, and the tool is run down the hole on its own cable. The new tool is the same size as the first, but uses about half the power to generate more heat, says Tokarek.  	The second-generation tool is also less expensive to build and deploy. Furthermore, the 66-kilowatt generator to run the first prototype has been replaced with a 22-kilowatt one that uses power more efficiently.  	Modifications made to the Gen2 are designed to increase its heating capability to 250 C from the previous prototype&#8217;s 190 C, for increased steam and pressure buildup in the reservoir.  	&#8220;We can run it down ourselves; we don&#8217;t need any other side operators. It&#8217;s more powerful and the elements have changed,&#8221; says Tokarek of the second tool.  	There is another Gen2 DHT that&#8217;s ready for further testing, and if results of the first batch of second-generation tests are promising, another six DHTs will be built starting a month or two later for further testing or for sale. Interest in the tools has come from several North American companies and as far away as the Middle East.  	While the DHT is designed primarily to recover heavy oil, it can also be used to produce light oil where heat is needed to keep wells warm to prevent the attendant paraffin from solidifying halfway up the well, says Sprinkle.  	&#8220;It&#8217;s parallel to some of my own ideas and that&#8217;s one reason I&#8217;m quite excited about it,&#8221; he says.</p>
<p style="margin-top: 20px; text-align: right"><strong>• </strong>Lynda Harrison</p>
<p style="margin-top: 30px">&nbsp;</p>
<p><strong>CONTACT FOR MORE INFORMATION</strong></p>
<p>Robert Sim, Petrostar Petroleum, Tel: (604) 662-3004 x105, Email: <a href="mailto:rasim@petrostarpetroleum.ca">rasim@petrostarpetroleum.ca</a></p>
]]></content:encoded>
			<wfw:commentRss>http://petrostarpetroleum.ca/blog/archives/41/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
